The PropTech startup myAEDES locks up a 585 thousand euro investment round.

myAEDES is a digital tool that protects engineers, architects and surveyors who work professionally on site, allowing them to keep track, in great detail, of the quality of the work performed.

myAEDES locks up a 585 thousand euro investment round.The platform supports professionals during site inspections, allowing them to document the progress of the work in real time while attaching certified notes and photos.

myAEDES: Mobile Construction Management

To further improve the user experience and workflow, making it simpler and more intuitive, a new “mobile-first” IT platform has been developed, designed to be navigated from smartphones and tablets directly on site. Thanks to myAEDES, professionals can manage multiple construction sites from the same app wherever they are: in the office, on site and even abroad with obvious advantages in terms of time and money: with myAEDES they finish the job even before leaving the construction site.

“We have found that although there are specific regulatory obligations, as well as moral obligations, which impose the tracing of activities to ensure the transparency and safety of construction sites, unfortunately, these obligations are deliberately ignored by many professionals in the sector. myAEDES supports the work of all those professionals who seek transparency and want to demonstrate the high standard of their work. The management systems allows the easy and quick compilation of reports such as the work journal and the inspection report attaching photos and certified notes via smartphone” 

Marco Apollonia, CEO & Co-Founder

By using myAEDES, professionals who work in full compliance with the law are protected from possible future conflicts thanks to the document archive saved in the cloud. In fact, in case of a discord, the completed work can be documented through a detailed register of photos, notes and documents with probative value. For the construction world, this is a step forward towards greater standards of transparency to ascertain responsibility even in the event of future problems.

Founded in Campania thanks to the intuition of three under 30 engineers, Chiara Maresca, Giulio Santabarbara and Marco Apollonia with experiences in the sector, myAEDES was launched by the LVenture Group with its LUISS EnLabs Acceleration Program. As in today the software is used by thousands of professionals in Italy and Europe who produce more than 5,000 reports a month and have uploaded over 100,000 photos and certified notes to the platform. Thanks to the new capital increase, myAEDES aims to strengthen the customer base in Italy, which is growing rapidly, and to increase its international presence. The startup already operates in Spain, Germany and France, reference markets for the company’s international growth.

A growth that is also driven by the market: more and more digital entrepreneurs and investors throughout Europe identify the construction industry as the most promising sector for rapid technological progress in a market that, in European alone, reaches the impressive size of 2,000 billion euros. The impact that digital transformation is having on a sector that has not seen a real technological revolution since the introduction of CAD models (more than 50 years ago now) make PropTech one of the main investment opportunities.

 

Sources:

Forbes,  Proptech360 ,  Linkedin

Info:

Request a quote

Pronto a digitalizzare
il tuo cantiere?

Unisciti a migliaia di professionisti che hanno già scelto myAEDES per gestire i loro progetti.

News correlate